Free shipping on orders over $200 · Made in Brooklyn for all 5 boroughs
Who needs it: Owners of occupied NYC apartment buildings filing for major construction or emergency work with DOB, and new buildings applying for a TCO.
$45.00
One for the lobby plus one for each floor




Local Law 159 of 2017 (HMC Section 27-2009.2) requires the Safe Construction Bill of Rights when an owner files with DOB for work beyond minor alterations or ordinary repairs. The owner either gives it to every tenant or posts it in the lobby and on every floor within 10 feet of each elevator bank. In buildings with no elevator, it goes within 10 feet of or inside each main stairwell.
It stays up until the permitted work is finished, so a printed sign beats a paper sheet that gets torn down. It is posted in English, with Spanish, Arabic, Haitian Creole, Chinese, Korean and Russian versions available as needed. Owners also post the separate Tenant Protection Plan notice. Read more at DOB Safe Construction.
At the same time you file a DOB permit application for major work, or with emergency work. New buildings post it when applying for a temporary certificate of occupancy.
One for the lobby and one for each floor near each elevator bank. A 6 story elevator building with one bank needs 7.
Until the permitted work is complete.
It is posted in English and made available in Spanish, Arabic, Haitian Creole, Chinese, Korean and Russian as necessary. We can print any of these.
No. The Tenant Protection Plan notice is separate and also goes to tenants during work.
Same rules in every borough. Orders over $200 ship free anywhere in New York City.
Send us your address and number of apartments. We reply with a free list of every sign your building needs, with quantities.
Get My Free Sign List